What Is the Time Evaluation Control Record and Why Do You Need It?


Time ManagementTime EvaluationControl RecordPayrollOrchestraHCM

Time evaluation turns attendance, absence, clock-in and overtime data into the results that go to payroll at month end. Once these results have been checked and passed to payroll, a single leave entered on a past day can make payroll and time evaluation disagree.

The time evaluation control record manages exactly this risk. For each time area it answers two questions: Which past days can no longer change? and May time evaluation run in actual mode right now? In this post we explain what the control record is, its statuses and dates, and how it is used at a typical month end.

Where Is It?

The control record is the first tile of the Time Management module. Its subtitle sums it up: the time period and its lock status.

Tiles of the Time Management module
Time Management module: the control record is the first tile.

Time Area

The control record is not one record for the whole company; there is one for each time area. The time area is part of the employee's organizational assignment and groups the employees whose time evaluation closes on the same calendar. For example, salaried employees may close at month end while hourly employees close on a different calendar.

The Records table on the right shows the first date, last date and status of every time area at a glance. You choose a time area on the left, change its status and dates, and save.

Time evaluation control record screen
Time area 01 Monthly is in correction: November 1, 2026 and later can be corrected, earlier days are locked.

Three Statuses

The control record of each time area has one of these three statuses:

StatusActual run of time evaluation?Time dataWhen is it used?
Release time evaluationYesLocked on and before the last dateThe period is closed; time evaluation keeps running, the past is not touched.
Release correctionYesChangeable from the earliest start date on, locked before itAn error was found in the check; corrections are made from a given day on and time evaluation runs again.
Check time evaluation resultsNoLocked on and before the last dateThe results are being reviewed; neither the data nor the results change.

The actual mode is the run in which time evaluation writes its results permanently. While the results are being checked there is no actual run, so nobody can recalculate and change the figures during HR's review.

Two Dates

  • Last runnable time evaluation date: when time evaluation is released or its results are being checked, this day and the days before it are locked. At month end it is usually the last day of the closing month.
  • Earliest start date: the first day that may change in correction. From this day on (with no limit into the future) corrections are allowed; the day before and earlier stay locked. In the screenshot the earliest start date is November 1, 2026, so October is protected and November can be corrected.

The last change box at the bottom shows who last changed the record, when, and to which status, so the answer to "why is this period open?" is right on the screen.

What Does the Lock Cover?

The lock applies to the infotypes that affect time evaluation: those with Changes trigger time evaluation in the infotype settings. In the standard setup, absences, attendances, absence and attendance quotas, time events, payment documents and the work schedule are examples.

The lock applies whatever way the data comes in: the HR infotype screen, an employee's self-service request, a leave workflow approved by the manager, bulk import from Excel, clock-in data and calendar screens all go through the same check. When a change hits a locked day, it stops and says clearly which employee, which infotype, up to which date and why:

Infotype 2001 of 00001234 cannot be changed on or before 2026-10-31: time area 01 is released (time control record)

A time area without a control record locks nothing, but time evaluation does not run in actual mode for it either. So create a control record for every time area before going live with time evaluation.

Example: A Typical Month End

For salaried employees, the control record of November 2026 might move like this:

StepStatusEarliest start dateLast dateEffect
During the monthRelease time evaluation—10/31/2026October is closed, November data is entered freely and time evaluation runs every day.
Month endCheck time evaluation results—11/30/2026November is frozen; HR checks the results, the figures going to payroll do not change.
If an error is foundRelease correction11/1/202611/30/2026November is opened; corrections are entered, time evaluation runs again and the corrections reach the results.
Closing the periodRelease time evaluation—11/30/2026November is closed; December data starts coming in.

The benefit of this flow is that every step is a deliberate decision: to reopen a closed month, someone has to put the control record into correction, and that change shows on the record with who and when.

Why Do You Need It?

  • Payroll and time evaluation stay consistent. Later changes in a period already passed to payroll are blocked.
  • Figures do not move during the check. While the results are checked there is no actual run and no data changes.
  • Corrections are controlled. Retroactive corrections are possible only from the day explicitly allowed, and they reach the results.
  • Each time area closes on its own calendar. Salaried and hourly periods do not wait for each other.
  • Traceability. Who last changed the record is visible on the screen.

Explore OrchestraHCM Time Management

For time evaluation, shift planning and time management processes, see the Time Management module or get in touch with us.

What Is the Time Evaluation Control Record and Why Do You Need It? | OrchestraHCM Blog